8:30am to 4:30pm Monday to friday. Supplying the UK since 2001. Underfloor Heating manifolds comes with. "A" Rated Grundfos Pump Pack. "A" Rated Wilo Pump Pack.
1 x pre-mounted manifold with flow meters. 2 x temp gauge (fitted to ball valves). Eurocones fitting (ex: 8 port 16 euros, 16mmx2mm).
A Rated Grundfos Flex UMP3 or Wilo pump. Brass/nickel plated push fittings, easy to install available with up to 12 ports. Supplied on a pre-mounted bracket. CMax working pressure 3 bar max test pressure 10 bar.Grundfos UPM3 A-rated pump or Wilo A-rated pump our mixer set has a thermostatic valve to control the flow temperature of water to the underfloor heating pipes. Temperature range: 35C - 65CMax working pressure. 10 bar compression connections for ease of installation. Our manifolds are for use on underfloor heating systems.
Manifold bars, one for the flow and one for the return, complete with ball valves, drain/. Filling valves and air vent. On the flow bar each port has a high-performance flow indicator, with isolator including an easy-to-read gauge-glass. Each port on the return bar is equipped with an integral control valve and protection cap which allows the user.
To adjust the volume of water or can be removed to accept a Manifold Thermoelectric head. Please add 150mm to the length when the pump and mixer are fitted. "A" Rated Eco-Circ Pump Pack. A Rated Grundfos Flex UMP3 or Wilo or Eco-Circ pump. Please see image 12 for key.A B C D E. 2 circuit UFH manifold kit 320mm 210mm 50mm 276mm 90mm.
3 circuit UFH manifold kit 320mm 210mm 50mm 326mm 90mm. 4 circuit UFH manifold kit 320mm 210mm 50mm 376mm 90mm. 5 circuit UFH manifold kit 320mm 210mm 50mm 426mm 90mm.6 circuit UFH manifold kit 320mm 210mm 50mm 476mm 90mm. 7 circuit UFH manifold kit 320mm 210mm 50mm 526mm 90mm. 8 circuit UFH manifold kit 320mm 210mm 50mm 576mm 90mm. 9 circuit UFH manifold kit 320mm 210mm 50mm 626mm 90mm.
10 circuit UFH manifold kit 320mm 210mm 50mm 676mm 90mm. 11 circuit UFH manifold kit 320mm 210mm 50mm 726mm 90mm. 12 circuit UFH manifold kit 320mm 210mm 50mm 776mm 90mm. Installation for a Multiple Room.
Select a suitable location for the pump and manifold unit and mount on the wall. Refer to the typical pipe installation. And determine the pipe layout - the layout is not critical and can be varied to suit site conditions, the important criteria being the pipe spacing, see below. The pipe is marked every metre by the metre.
Maximum length for any circuit Is 100m. 70m for low profile 12mm pipe circuit. Pipes should be laid l 00mm away from walls.
Do not lay pipe under fixed units. Lay the rooms furthest from the manifold and work back, do the room with the manifold last.
Hen pipes to/from one area pass through another area, the two pipes should be run together, the'bunches' of pipes should then be spaced as if they were one pipe. Lay the pipe as planned, fixing every 50cm if on a screeded celotex base and return to the manifold. The pipe is kinked when bending.
The pipe should be straightened and rearranged so that the location of the kink remains in a straight length, no other remedial action is. FILLING THE MANIFOLD SYSTEM cont. IMPORTANT that the underfloor heating system is properly filled with water and purged completely of air to ensure correct operation, it is therefore necessary to follow the procedure below.
IT IS NOT ADEQUATE TO FILL THE SYSTEM USING THE BOILER FILLING LOOP! Connect a hose from a mains pressure cold water supply to the hose connection on the top (flow) manifold, and another hose from the hose connection on the bottom (return) manifold to a drain. Ensure that all the white caps on the bottom (return) manifold are screwed down, closing the valves. Ensure that the main flow & return ball valves are closed on the manifold. Turn on the water and open the hose connection valve on the top (flow) manifold.
7 Open the first circuit valve by unscrewing the white cap allowing water to flow into the pipe. Open the hose connection valve on the bottom (return manifold) allowing water to flow freely into the drain until the water is clear with no air bubbles.
Open the second circuit valve (white cap) and close the first. Open the third circuit valve and close the second etc.Continue until the last circuit has been purged and close the hose connection valve on the bottom (return) manifold before closing the last circuit valve (white cap). While under pressure, check manifold & pipework for leakage.
Close hose connection valve on the top (flow manifold) and remove the hoses. Screed or chipboard flooring should be laid immediately after pipelaying to protect the pipe.Concrete screed floors must be cured before any heat is applied, a general rule of thumb is to allow 7 days per 2 millimetres of the screed. Timber floor with drymix infill can have heat applied immediately, the drymix must be dried completely before laying the flooring.
Hardwood timber flooring must be'conditioned' before fixing. It is important to purge the pipework from the boiler to the manifold, to avoid air being introduced into the underfloor heating system. It is not normally necessary to balance the system but if required follow this procedure.
The system is balanced by running the pump and adjusting the flow to each zone by turning the square spigot s under the white caps on the. Bottom manifold, the flow in the respective sight glasses should be set at a figure calculated by dividing the length of pipe for that zone by 40. Example: Circuit 1, 85m/40= approx2 on the scale. Low profile systems circuit at.
Fit actuators to valves after connecting the control wiring. It is important that the actuators are screwed tightly on to the valve.
Initially start the system with the thermo static valve set at min (35°c). Increase the setting by 5°c per day, up to a maximum of 50° for concrete floors, max 65° for timber floors. The flow & return from the boiler should be connected to the manifold connections shown using compression couplings.
When first starting up the system it may take 12-24 hours for the heating effect. MAINTENANCE We recommend that the following maintenance be carried out annually. Check that all actuator nuts are tightened firmly and that actuators are not loose. Remove end plug from pump and check that pump rotates when energised. Turn up thermostats & check that actuators move into open position also check flow gauges are indicating. If not, re-pressurise manifold, remove indicator, clean & replace, repressurise manifold. Kudos Trading is one of the UKs leading underfloor heating brands. We are one of the largest suppliers of Underfloor Heating Systems in the UK, but still able to offer a personal service with our staff based in Nottinghamshire. We are dedicated to supplying the best quality underfloor heating products at affordable prices & this is supported by first-class customer service & advice. Whether you are just tiling a small bathroom or looking for a full home heating system, we are confident that we have the right system for you. Our Range includes water underfloor heating kits or just the underfloor heating manifold, underfloor heating pipe, heated floor mat, free cable, insulation, mirror demister pads, plus many products. Where to Start with Underfloor Heating. So how do you sort the wood from the trees? Our advice is to do some basic research on the company; do they give you an address & a number you can contact if something goes wrong? If you live in the Midlands you are welcome to come to our factory showroom & see our products for yourself, we will be happy to sit down & discuss your options. We accept all forms of credit and debit card's even Amex! We hold all our stock here at our 7000 square foot factory in Hucknall Nottingham.(Highlands of Scotland & Ireland can be 2-3 day's). We make every effort to ensure your item arrives as you expect but from time to time. We use the APC network for all our parcel deliveries so if your item is damaged make sure you sign for it damaged. We are a family run business operating from Hucknall in Nottingham.
We are open Mon-Fri 8:30am to 4:30pm. Pop in and see us. Underfloor Heating manifolds comes with: "A" Rated Grundfos Pump Pack. Items included: 1 x pre-mounted manifold with flow meters 1 x end vent 1 x pressure gauge 2 x ball valves 2 x temp gauge (fitted to ball valves) Eurocones fitting (ex: 8 port 16 euros, 16mmx2mm) 1 Sample per customer Options: "A" Rated Grundfos Flex UMP3 or Wilo or Eco-Circ pump.Pump station (blending valve) Brass/nickel plated push fittings, easy to install available with up to 12 ports. Temperature range: 35C - 65CMax working pressure: 10 bar compression connections for ease of installation.
These consist of two manifold bars, one for the flow and one for the return, complete with ball valves, drain/ filling valves and air vent. Each port on the return bar is equipped with an integral control valve and protection cap which allows the user to adjust the volume of water or can be removed to accept a Manifold Thermoelectric head.
Manifold dimensions: Please add 150mm to the length when the pump and mixer are fitted. A B C D E 2 circuit UFH manifold kit 320mm 210mm 50mm 276mm 90mm 3 circuit UFH manifold kit 320mm 210mm 50mm 326mm 90mm 4 circuit UFH manifold kit 320mm 210mm 50mm 376mm 90mm 5 circuit UFH manifold kit 320mm 210mm 50mm 426mm 90mm 6 circuit UFH manifold kit 320mm 210mm 50mm 476mm 90mm 7 circuit UFH manifold kit 320mm 210mm 50mm 526mm 90mm 8 circuit UFH manifold kit 320mm 210mm 50mm 576mm 90mm 9 circuit UFH manifold kit 320mm 210mm 50mm 626mm 90mm 10 circuit UFH manifold kit 320mm 210mm 50mm 676mm 90mm 11 circuit UFH manifold kit 320mm 210mm 50mm 726mm 90mm 12 circuit UFH manifold kit 320mm 210mm 50mm 776mm 90mm Installation for a Multiple Room 1. See next page for assembly.
Refer to the typical pipe installation drawings and determine the pipe layout - the layout is not critical and can be varied to suit site conditions, the important criteria being the pipe spacing, see below 3. Pipes should be laid l 00mm away from walls 5. If the pipe is kinked when bending. The pipe should be straightened and rearranged so that the location of the kink remains in a straight length, no other remedial action is required. The system is balanced by running the pump and adjusting the flow to each zone by turning the square spigot s under the white caps on the bottom manifold, the flow in the respective sight glasses should be set at a figure calculated by dividing the length of pipe for that zone by 40. Low profile systems circuit at 70m;-40=1.75. The item "WATER UNDERFLOOR HEATING KIT MANIFOLDS 2 TO 8 PORTS A RATED GRUNDFOS PUMP PACK" is in sale since Wednesday, November 15, 2017.This item is in the category "Home, Furniture & DIY\Heating, Cooling & Air\Heaters & Radiators\Underfloor Heating Systems". The seller is "kudos-trading" and is located in Nottingham. This item can be shipped to United Kingdom, Antigua and barbuda, Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Australia, United States, Bahrain, Canada, Brazil, Japan, New Zealand, China, Israel, Hong Kong, Norway, Indonesia, Mexico, Singapore, South Korea, Switzerland, Taiwan, Thailand, Bangladesh, Belize, Bermuda, Bolivia, Barbados, Brunei darussalam, Cayman islands, Dominica, Ecuador, Egypt, Guernsey, Gibraltar, Guadeloupe, Grenada, French guiana, Iceland, Jersey, Jordan, Cambodia, Saint kitts and nevis, Saint lucia, Liechtenstein, Sri lanka, Macao, Monaco, Maldives, Montserrat, Martinique, Nicaragua, Oman, Pakistan, Peru, Paraguay, Reunion, Turks and caicos islands, Aruba, Saudi arabia, South africa, United arab emirates, Ukraine, Chile, Bahamas, Colombia, Costa rica, Guatemala, Honduras, Jamaica, Kuwait, Panama, Philippines, Qatar, Trinidad and tobago, Uruguay, Viet nam.